﻿_id	Project Name	Functional Area	Responsible Department	Project Manager	2014 CDBG	2014 Bond	2014 Paygo	2014 Other	2014 Total	2015 CDBG	2015 Bond	2015 Paygo	2015 Other	2015 Total	2016 CDBG	2016 Bond	2016 Paygo	2016 Other	2016 Total	2017 CDBG	2017 Bond	2017 Paygo	2017 Other	2017 Total	2018 CDBG	2018 Bond	2018 Paygo	2018 Other	2018 Total	2019 CDBG	2019 Bond	2019 Paygo	2019 Other	2019 Total	2020 CDBG	2020 Bond	2020 Paygo	2020 Other	2020 Total	Total CDBG	Total Bond	Total Paygo	Total Other	Total Total	Project Description	Project Justification	Prior Year Funds (As of 11/30/2014)	JDE Number (CDBG)	JDE Number (Bond/Paygo)	New/Recurring/Continuing	Operating Budget Impact	Project Type	Deliverable 1	Location 1	Duration 1	Cost 1	Deliverable 2	Location 2	Duration 2	Cost 2	Deliverable 3	Location 3	Duration 3	Cost 3	Deliverable 4	Location 4	Duration 4	Cost 4	Deliverable 5	Location 5	Duration 5	Cost 5	Deliverable 6	Location 6	Duration 6	Cost 6	Deliverable 7	Location 7	Duration 7	Cost 7	Deliverable 8	Location 8	Duration 8	Cost 8	Deliverable 9	Location 9	Duration 9	Cost 9	Deliverable 10	Location 10	Duration 10	Cost 10	Deliverable 11	Location 11	Duration 11	Cost 11	Deliverable 12	Location 12	Duration 12	Cost 12	Deliverable 13	Location 13	Duration 13	Cost 13	Deliverable 14	Location 14	Duration 14	Cost 14	Deliverable 15	Location 15	Duration 15	Cost 15	Deliverable 16	Location 16	Duration 16	Cost 16	Deliverable 17	Location 17	Duration 17	Cost 17	Deliverable 18	Location 18	Duration 18	Cost 18	Deliverable 19	Location 19	Duration 19	Cost 19	Deliverable 20	Location 20	Duration 20	Cost 20	Deliverable 21	Location 21	Duration 21	Cost 21	Deliverable 22	Location 122	Duration 22	Cost 22	Deliverable 23	Location 23	Duration 23	Cost 23	Deliverable 24	Location 24	Duration 24	Cost 24	Deliverable 25	Location 25	Duration 25	Cost 25	Deliverable 26	Location 26	Duration 26	Cost 26	Deliverable 27	Location 27	Duration 27	Cost 27	Deliverable 28	Location 28	Duration 28	Cost 28	Deliverable 29	Location 29	Duration 29	Cost 29	Deliverable 30	Location 30	Duration 30	Cost 30	Deliverable 31	Location 31	Duration 31	Cost 31	Deliverable 32	Location 32	Duration 32	Cost 32	Deliverable 33	Location 33	Duration 33	Cost 33	Deliverable 34	Location 34	Duration 34	Cost 34	Deliverable 35	Location 35	Duration 35	Cost 35	Deliverable 36	Location 36	Duration 36	Cost 36	Deliverable 37	Location 37	Duration 37	Cost 37
1	28th Street Bridge	Engineering and Construction	Public Works	Assistant Director, Transportation & Engineering		""			0	37500			712500	750000		25850		491150	517000			""		0		5000	""	95000	100000		""	275000	5225000	5500000		""			0	37500	30850	275000	6523650	6867000	This project is a replacement of the 28th Street Bridge, originally constructed in 1931 on the site of a previous bridge, which connects the Strip and the neighborhood of Polish Hill. The bridge carries 28th Street between Liberty Avenue and Brereton street, a total length of 315 feet.	The project is on the regional TIP. This provides an 80% match of Federal Highway Administration funds to the City's 20% match. Since such a large share of the cost is borne by non-city entities, TIP projects are high priorities.	$ -	4030088150.0	""	New	This project represents minimal operating expense other than the time of Engineering staff. A new bridge should realize some operational maintenance savings.	Capital Project	Engineering Phase	28th Avenue at Brereton Street	2 years	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
2	Audibles and Traffic Signal Hardware	Engineering and Construction	Public Works	Traffic Engineer, Transportation and Engineering	300000	""	100000		400000		175000		300000	475000	150000	150000			300000	150000	150000	""		300000	100000	150000	""		250000	150000	""	150000		300000	150000	""	150000		300000	700000	625000	300000	300000	1925000	This project includes purchasing and installing audible traffic signals, as well as significant upgrades to existing signalized intersections.	Adding audible signals is a component of the City's ADA transition plan, and maintenance is required to keep the traffic signal devices functioning at a responsible level.	608859.56	4067420150.0	4026711115.0	Recurring	Installation of new equipment will require a commitment of staff time, but will result in lower maintenance requirements in future years.	Capital Project	Audible Design and Construction	Forbes Avenue and Bellefield Avenue	2 months	25000.0	Audible Design and Construction	Seventh Avenue and Grant Street	2 months	25000	Audible Design and Construction	Liberty Avenue and Millvale Street	2 months	25000	Audible Design and Construction	Frankstown Road and Homewood Avenue	2 months	25000	Audible Design and Construction	Carson Street and Smithfield Street	2 months	25000	Signal Update Design and Construction	18th Street and Sarah Street	2 months	25000	Signal Update Design and Construction	18th Street and Jane Street	2 months	25000	TBD (ARLE Funding)	TBD	1 year	300000	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
3	Bike Facilities	Engineering and Construction	Public Works	Assistant Director, Transportation & Engineering		""			0		190000		750000	940000					0			""		0			""		0		""			0		""			0	0	190000	0	750000	940000	This project supports the creation of dedicated cycletracks in the city.	Enhancing bicycle access to our communities cuts down on road wear, bridges communities, and supports vibrant neighborhoods.	$ -	""	4030089015.0	New	Installation of new bike facilities will require a commitment of time and labor.	Capital Project	Central Business District Cycle Tracks	Stanwix Street and Boulevard of the Allies	6 months	440000.0	Homewood Cycle Tracks	Lincoln Avenue	6 months	93750	Schenley Park Cycle Tracks	Greenfield Road	6 months	125000	Northside Cycle Tracks	Allegheny Commons	6 months	156250	Contingency	TBD	TBD	125000	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
4	Bike Infrastructure	Engineering and Construction	Public Works	Assistant Director, Transportation & Engineering	50000	""	75000		125000		175000			175000	0	200000			200000		200000	""		200000		200000	""		200000		""	200000		200000		""	200000		200000	0	775000	400000	0	1175000	This project will result in the installation of bike lanes, racks, pavement markings, signs, and signals necessary to make the city more bike-friendly.	Enhancing bicycle access to our communities cuts down on road wear, bridges communities, and supports vibrant neighborhoods.	360731.62	""	4026740115.0	Recurring	Once completed, these lanes will have some maintenance requirements that will impact the operating budget.	Capital Project	Purchase and Installation of racks in Uptown and North Side	TBD	6 months	20000.0	Pavement Markings on Forbes Avenue, One Wild Place, Beacon Street, 40th Street, and Marshall Avenue	Various	6 months	100000	Contingency	TBD	TBD	55000	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
5	Bridge Repairs	Engineering and Construction	Public Works	Project Manager, Transportation and Engineering	200000	""	200000		400000	100000	200000			300000	200000	200000			400000	200000	250000	""		450000	100000	300000	""		400000	150000	""	300000		450000	150000	""	300000		450000	900000	950000	600000	0	2450000	This line provides funding for the engineering and repair of the City's 135 bridges.	Bridges are a critical component of our City's infrastructure and require significant repairs to prolong their useful lives.	1331249.54	4031011150.0	4023101115.0	Recurring	Staff time will be necessary to manage outside vendors. Preventative repairs represent substantial savings in cost for operational maintenance.	Capital Project	Mission Street Bridge Bearing Pin Repair	Mission Street and 18th Street	6 months	150000.0	Contingency	TBD	TBD	150000	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
6	Central Business District Signals, Phase III	Engineering and Construction	Public Works	Assistant Director, Transportation & Engineering		""			0		40000		160000	200000		833366		3333465	4166831			""		0			""		0		""			0		""			0	0	873366	0	3493465	4366831	This line provides funding for Phase III of upgrades to the Central Business District traffic signals, increasing the efficiency of downtown traffic flows.	This project will enhance signalization in the Central Business District.	$ -	""	CHECK WITH CONTROLLER'S OFFICE	New	This project will have minimal impact on the operating budget. Public Works staff time will be needed to manage vendor contracts.	Capital Project	Design and Engineering	TBD	1 year	200000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
7	Design, Construction, and Inspection Services	Engineering and Construction	Public Works	Various		""			0		250000			250000	100000	100000			200000	125000	125000	""		250000	100000	100000	""		200000	100000	""	100000		200000	100000	""	100000		200000	525000	575000	200000	0	1300000	The purpose of these funds is to provide access on an on-call basis to architectural, engineering, and construction inspection and management expertise as needed to supplement more complex design assignments and construction projects.	The City may require the additional use of outside expertise to undertake specific engineering and construction projects.	100000.0	""	4030099015.0	New	This project will have minimal impact on the operating budget. Public Works staff time will be needed to manage vendor contracts.	Capital Project	Contingency	TBD	TBD	100000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
8	Flex Beam Guiderails	Engineering and Construction	Public Works	Operations Manager, Transportation and Engineering	50000	""	50000		100000	70000	30000			100000		50000			50000		50000	""		50000		50000	""		50000		""	50000		50000		""	50000		50000	70000	180000	100000	0	350000	This project will provide funding for flex beam guiderails along city streets and hillsides in a cost-effective manner.	Guiderails increase public safety along the road.	258895.48	4031810150.0	4023181015.0	Recurring	A portion of this project will be completed by Public Works staff, and a portion will be completed by outside vendors.	Capital Project	Installation	Williams Street and Cola Street	1 month	2000.0	Installation	One Wild Place and Butler Street	1 month	7000	Installation	Noblestown Road and Queensbury	2 months	20000	Installation	Carrick Avenue and Eiler Avenue	1 month	5000	Installation	Shaler Street and Woodville Avenue	1 month	4000	Installation	Stanton Avenue and Woodbine Street	1 month	2000	Installation	Spring Garden Avenue and Braun Street	1 month	10000	Installation	Baldwin Road and Calera Street	2 months	16000	Installation	Oporto Street and Huron Street	1 month	3000	Installation	Mossfield Street and Columbo Street	1 month	8000	Installation	Brule Street and Wurzell Street	1 month	3000	Contingency	TBD	1 year	20000	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
9	Flood Control Projects	Engineering and Construction	Public Works	Project Manager, Transportation and Engineering		""			0		250000	200000	800000	1250000			200000	800000	1000000		200000	""	800000	1000000		200000	""	800000	1000000		""	200000	800000	1000000		""	200000	800000	1000000	0	650000	800000	800000	2250000	This project provides funding for work to eliminate flooding issues in various locations throughout the city, through work the city undertakes on its own or in cooperation with other authorities or government agencies.	Flooding represents a major public safety concern to residents throughout the city. This project promotes shared delivery of stormwater improvements.	$ -	""	4030090015.0	New	The city will work with partners to conduct the work or administer the contracts, as the case may be.	Capital Project	City Match for Banksville project design, engineering, and construction	Hayson Avenue and Red Oak Drive	5 months	200000.0	Flavian Drain project construction	Flavian Street and Croesus Street	3 months	50000	Streets Run Flood Control project	Streets Run and Glass Run	1 year	1000000	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
10	Greenfield Avenue Bridge	Engineering and Construction	Public Works	Assistant Director, Transportation & Engineering		""	60000	60000	120000		950000		18050000	19000000					0			""		0			""		0		""			0		""			0	0	950000	0	18050000	19000000	This project results in the construction of a new bridge at Greenfield Avenue.	The project is on the regional TIP. This provides an 80% match of Federal Highway Administration funds to the City's 20% match.	383686.97	""	4026737615.0	Continuing	This project will result in a new bridge that will require minimal maintenance.	Capital Project	Construction	Greenfield Avenue and Beechwood Boulevard	1 year	19000000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
11	Liberty Avenue SINC UP	Engineering and Construction	Public Works	Assistant Director, Transportation & Engineering		""			0		42500		422153	464653		42500		422153	464653			""		0			""		0		""			0		""			0	0	85000	0	844306	929306	This project consists of upgrading controllers and pedestrian indications at 11 signalized intersections along Liberty Avenue in the Central Business District. Upgrades will include countdown pedestrian heads, audible pedestrian signals, updated pavement markings and improved signal phasing and timing.	The project is on the regional TIP. This provides an 80% match of Federal Highway Administration funds to the City's 20% match.	$ -	""	4030091015.0	Continuing	The signals will need to be periodically maintained by the city to maintain their useful life.	Capital Project	Construction	Liberty Avenue and Commonwealth Place to Grant Street	1 year	464653.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
12	Penn Avenue Phase I	Engineering and Construction	Public Works	Assistant Director, Transportation & Engineering		""			0		120000		480000	600000					0			""		0			""		0		""			0		""			0	0	120000	0	480000	600000	The project will reconstruct the street from building face to building face, from Mathilda Street to Evaline Street.	This project is on the regional TIP.	$ -	""	4026748015.0	Continuing	Operational maintenance will be necessary for any new features added to the streetscape or intersection.	Capital Project	Construction	Penn Avenue and Mathilda Street to Evaline Street	1 year	600000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
13	Penn Avenue Phase II	Engineering and Construction	Public Works	Assistant Director, Transportation & Engineering		""			0		100000		400000	500000		100000		400000	500000			""		0		377417	""	1509666	1887083		""	100000	1900000	2000000		""			0	0	577417	100000	4209666	4887083	This project will reconstruct the street from building face to building face, from Evaline Street to Graham Street.	This project is on the regional TIP.	$ -	""	4430100015.0	New	Operational maintenance will be necessary for any new features added to the streetscape or intersection.	Capital Project	Construction	Penn Avenue and Evaline Street to Graham Street	1 year	500000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
14	PennDOT Local Share	Engineering and Construction	Public Works	Assistant Director, Transportation & Engineering		""			0		470000			470000		200000			200000		200000	""		200000		200000	""		200000		""	200000		200000		""	200000		200000	0	1070000	400000	0	1470000	This line item provides local funding for additional improvements undertaken by PennDOT within the city.	PennDOT is performing work on these projects already, and the city has an opportunity to make capital improvements at lower cost by partnering on the local match.	$ -	""	4030092015.0	New	The work will be undertaken by PennDOT, requiring minimal work by the operating departments.	Capital Project	Repair Bigelow approach to the Bloomfield Bridge	Bloomfield	5 months	948980.0	Repairs of the Chestnut Street Bridge	Chestnut Street	5 months	735000	Replacement of various ADA ramps throughout the City	TBD	1 year	300000	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
15	Ramp and Public Sidewalk	Engineering and Construction	Public Works	Engineer, Transportation and Engineering	300000	""	100000		400000	100000	300000			400000	200000	1100000			1300000	200000	100000	""		300000	150000	100000	""		250000	200000	""	100000		300000	200000	""	100000		300000	1050000	1600000	200000	0	2850000	This project provides funding for the design, installation, and repair of neighborhood handicap curb ramps and public sidewalks throughout the city.	The design and repair of curbs and sidewalks improves pedestrian safety throughout the city and makes our communities more accessible.	188278.79	4020060150.0	4026750115.0	Recurring	Public Works staff time will be needed to complete this project, including administering vendor contracts and performing labor.	Capital Project	Sidewalk Construction	Hallock Street	1 month	46000.0	Sidewalk Construction	Lafayette	2 weeks	13000	Sidewalk Construction	26th Street and Liberty Avenue	3 weeks	36000	Sidewalk Construction	Brighton Road	3 weeks	25000	Sidewalk Construction	Shadeland Road	2 weeks	10000	Sidewalk Construction	Ridgeway Street	3 weeks	17000	Ramp Construction	Bates Street and Romero Street	2 weeks	7000	Ramp Construction	16th Street and Carson	2 weeks	3000	Ramp Construction	Beatty Street and Commerce Street	2 weeks	2000	Ramp Construction	Lunark Street	2 weeks	2000	Ramp Construction	North Avenue and Brighton Road	2 weeks	2000	Ramp Construction	Smallman Street and 21st Street	2 weeks	5000	Ramp Construction	Flatbush Avenue and Berwin Street	2 weeks	13000	Ramp Construction	Jeffers Street and Fadette Street	2 weeks	3000	Ramp Construction	Walnut Street and Telegraph Way	2 weeks	3000	Ramp Construction	Orchard Place and Georgia Avenue	2 weeks	10000	Ramp Construction	Forbes Avenue and Murray Avenue	2 weeks	8000	Ramp Construction	Center Avenue and Craig Street	2 weeks	10000	Ramp Construction	Sebring Street and Dagmar Street	2 weeks	10000	Ramp Construction	Cedarville Street and Corday Street	2 weeks	6000	Ramp Construction	Cedar Street and Nash Street	1 month	24000	Ramp Construction	East Liberty Boulevard and Franstown Avenue	2 weeks	10000	Ramp Construction	Craft Avenue and Hamlet Street	2 weeks	7000	Ramp Construction	East Liberty Boulevard and Dahlem Place	2 weeks	2000	Ramp Construction	Eden Way and 40th Street	1 month	16000	Ramp Construction	Sarah Street and 23rd Street	2 weeks	8000	Ramp Construction	Forbes Avenue and Shady Avenue	2 weeks	10000	Ramp Construction	Fifth Avenue and North Bouquet Street	2 weeks	3000	Ramp Construction	Fifth Avenue and South Aiken Avenue	2 weeks	5000	Ramp Construction	Virginia Avenue at Rohm Way	2 weeks	2000	Ramp Construction	Jancey Street and Vilsack Street	2 weeks	3000	Ramp Construction	Cambronne Street and Winhurst Street	2 weeks	5000	Ramp Construction	East Carson Street and 13th Street	2 weeks	2000	Ramp Construction	North Avenue and Cedar Avenue	2 weeks	5000	Ramp Construction	Center Avenue and Melwood Avenue	2 weeks	7000	Sidewalk Contingency	TBD	TBD	30000	Ramp Contingency	TBD	TBD	30000
16	Signage	Engineering and Construction	City Planning	Assistant Director, City Planning		""	45000		45000		180000		357890	537890	25000	130998		436102	592100	25000	25000	""		50000		25000	""		25000		""	25000		25000		""	25000		25000	50000	360998	50000	793992	1254990	This project provides for signage in the public realm.	Proper signage assists in wayfinding and neighborhood branding.	45000.0	""	1126749815.0	Recurring	Signs will need to be installed and maintained by Public Works.	Capital Project	Downtown Wayfinding Signage	TBD	6 months	50000.0	On-Road Cycling Wayfinding Signage	TBD	6 months	487890	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
17	Slope Failure Remediation	Engineering and Construction	Public Works	Project Manager, Transportation and Engineering	200000	""	300000		500000		400000			400000	270000	300000			570000	200000	300000	""		500000	100000	300000	""		400000	200000	""	400000		600000	250000	""	400000		650000	1020000	1300000	800000	0	3120000	Funds from this line item will cover the cost of corrective action to stabilize slides and earth movement.	Hillside destabilization represents a public safety risk requiring vigilance.	2269795.42	4039103150.0	4023910315.0	Recurring	This project will have minimal impact on the operating budget. Public Works staff time will be needed to manage vendor contracts.	Capital Project	Slope Remediation and Wall Reconstruction	Brahm Street	6 months	200000.0	Contingency	TBD	TBD	300000	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
18	Street Lights	Engineering and Construction	Public Works	Operations Manager, Transportation and Engineering	200000	""	280000		480000		325000			325000	250000	150000			400000	250000	200000	""		450000	150000	250000	""		400000		""	300000		300000	100000	""	100000		200000	750000	925000	400000	0	2075000	This project funds street lighting repair and replacement citywide.	Street lights improve safety for all modes of transportation.	638762.41	4067489150.0	4026748315.0	Recurring	A portion of this project will be completed by Public Works staff, and a portion will be completed by outside vendors.	Capital Project	Installation of Street Lights at Bike Stations	TBD	1 year	25000.0	Installation of Street Lights on Bike Lanes	TBD	1 year	50000	Installation of Streetlights in the Southside Works	Sidney Street and 26th Street to Hot Metal Street	1 year	30000	Installation of Street Lights	Liberty Avenue and 9th Street	1 year	50000	Installation of Street Lights	Brownsville Road and Cherryhill Street	1 year	50000	Contingency	TBD	TBD	270000	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
19	Street Resurfacing	Engineering and Construction	Public Works	Paving Supervisor, Transportation and Engineering	585000	""	6500000		7085000	2000000	8000000	2000000		12000000	1000000	8000000	1000000		10000000	500000	9500000	""		10000000	500000	10000000	""		10500000	2000000	""	8000000		10000000	2000000	""	9800000		11800000	8000000	35500000	20800000	0	64300000	Provides for the resurfacing of city streets in Pittsburgh.	Adequately maintained streets are a core city service.	511899.61	4039000150.0	4026900015.0	Recurring	A portion of this project will be completed by Public Works staff, and a portion will be completed by outside vendors.	Capital Project	Contingency	TBD	1 year	10000000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
20	Streetscape and Intersection Reconstruction	Engineering and Construction	Public Works	Assistant Director, Transportation & Engineering		""	125000		125000	50000	175000			225000		300000			300000		350000	""		350000		400000	""		400000		""	400000		400000		""	400000		400000	50000	1225000	800000	0	2075000	Projects from this line item will include intersection improvements, greening, storm water management, street furnishings, public art and monuments, and multimodal improvements.	Improving streetscapes and intersections increases safety for all modes of travel and enhances the aesthetic of the city.	372714.24	4067430150.0	4026748615.0	Recurring	Operational maintenance will be necessary for any new features added to the streetscape or intersection.	Capital Project	Grandview Avenue Streetscape Improvements	Mt. Washington	1 Year	70000.0	War Memorials and Public Art	TBD	1 year	25000	Noblestown Road Streetscape Improvements	Noblestown Road	6 months	40000	Liberty Avenue Streetscape Improvements	Liberty Avenue	6 months	40000	Dairy District Streetscape Improvements	Brownsville Road	6 months	50000	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
21	Trail Repairs	Engineering and Construction	Public Works	Supervisor, Maintenance		""			0		50000			50000	20000	35000			55000	20000	35000	""		55000	20000	35000	""		55000	20000	""	35000		55000	20000	""	35000		55000	100000	155000	70000	0	325000	This project supports the capital improvement of existing trails, prolonging their useful lives.	Trails are important assets for regional transportation and recreation.	105000.0	""	1120590415.0	Recurring	Public Works staff time will be needed to complete this project.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
22	Wall, Step, and Fence Program	Engineering and Construction	Public Works	Project Manager, Transportation and Engineering	100000	""	100000		200000		225000	200000		425000	100000	300000			400000	100000	250000	""		350000	100000	300000	""		400000	100000	""	300000		400000	100000	""	300000		400000	500000	1075000	800000	0	2375000	This project will help construct, repair, and replace city walls, steps, and fences.	Deteriorated or missing walls, steps, and fences are a risk to the public. Enhanced walls, steps, and fences improve pedestrian access and safety.	407560.22	4033059150.0	4022003515.0	Recurring	A portion of this project will be completed by Public Works staff, and a portion will be completed by outside vendors.	Capital Project	Wall Reconstruction	Woodward Avenue	6 months	40000.0	Wall Reconstruction	Adon Street	6 months	30000	Wall Reconstruction	40th Street	6 months	15000	Wall Reconstruction Contingency	TBD	TBD	81000	Step Reconstruction	Wenzell Avenue	6 months	55000	Step Reconstruction	Round Top Street	6 months	64000	Step Repairs	Brushton Avenue	6 months	10000	Step Repairs	Troy Hill Road	6 months	5000	Step Contingency	TBD	TBD	100000	Railing Reconstruction	Shelly and Stella Street	5 months	25000	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
23	Wenzell Avenue Bridge	Engineering and Construction	Public Works	Assistant Director, Transportation & Engineering		""			0		400000		1600000	2000000					0			""		0			""		0		""			0		""			0	0	400000	0	1600000	2000000	This project will reconstruct the intersection with Old Banksville Road, and add a new culvert, traffic signals, curbs, sidewalks, and handicap ramps.	This project is on the regional TIP.	100000.0	""	4026719715.0	Continuing	This project represents minimal operating expense other than the time of Engineering staff. A new bridge should realize some operational maintenance savings.	Capital Project	Construction Phase	Wenzell Avenue and Banksville Road	1 year	2000000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
24	Architectural and Engineering Services	Engineering and Construction	Public Works	""		""	100000		100000					0					0			""		0			""		0		""			0		""			0	0	0	0	0	0	This line previously provided funding for professional service contracts with consulting firms.	This project will not be funded in the 2015 capital improvement plan in order to utilize prior years' funding.	68164.93	""	4026739914.0	Continuing	This project will have minimal impact on the operating budget. Public Works staff time will be needed to manage vendor contracts.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
25	Central Business District Signals, Phase II	Engineering and Construction	Public Works	Assistant Director, Transportation & Engineering		""	800000	3200000	4000000					0					0			""		0			""		0		""			0		""			0	0	0	0	0	0	Provided funding for the installation of traffic signals in the Central Business District.	This project was funded in the 2014 Capital Budget to enhance signalization in the Cental Business District and increase traffic efficiency.	3323763.09	""	4426722214.0	Completed	This portion of the project has been completed and will not have an impact on the operating budget.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
26	City Signal Update	Engineering and Construction	Public Works	Assistant Director, Transportation & Engineering	125000	""		900000	1025000					0		360000		1444000	1804000			""		0			""		0		""			0		""			0	0	360000	0	1444000	1804000	Provides funding for the purchase and installation of traffic signal hardware and software.	This project was funded in the 2014 Capital Budget for upgrades to traffic signals citywide. A portion of the project will also be funded in future years.	469750.0	4067420140.0	4026745214.0	Recurring	This portion of the project has been completed and will not have an impact on the operating budget.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
27	Concrete, Brick, and Block Stone	Engineering and Construction	Public Works	Assistant Director, Transportation & Engineering		""	200000		200000					0					0			""		0			""		0		""			0		""			0	0	0	0	0	0	Provided funding for improvement and enhancement of the city's concrete slabs, brick, and block stone surfaces.	This project was funded in the 2014 Capital Budget but similar needs will be funded under the Street Resurfacing line item moving forward.	209043.39	""	402674914.0	Recurring	This project will be funded under the Street Resurfacing line item.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
28	Forbes Avenue, Phase 1B	Engineering and Construction	Public Works	Assistant Director, Transportation & Engineering		""	915000	3657600	4572600					0					0			""		0			""		0		""			0		""			0	0	0	0	0	0	Provided funding for the implementation of street improvements along Forbes Avenue.	This project was funded in the 2014 Capital Budget and has been completed.	81606.07	""	4026736214.0	Continuing	Operational maintenance will be necessary for any new features added to the streetscape or intersection.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
29	Forbes Avenue, Phase 2A	Engineering and Construction	Public Works	Operations Manager, Transportation and Engineering		""			0					0					0		700000	""	2800000	3500000		700000	""	2800000	3500000		""			0		""			0	0	1400000	0	5600000	7000000	Provided funding for the implementation of street improvements along Forbes Avenue.	This project will be funded in future years as part of the Transportation Improvement Plan.	$ -	""	""	""	City Engineering staff will be required to adminster contracts. Operational maintenance will be necessary for any new features added to the streetscape or intersection.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
30	Neighborhood Street Improvements	Engineering and Construction	Public Works	Assistant Director, Transportation & Engineering	100000	""	100000		200000					0					0			""		0			""		0		""			0		""			0	0	0	0	0	0	Provided funding for the design and construction of street and intersection improvements.	This project was funded in the 2014 Capital Budget, but moving forward, similar projects will be funded under the Streetscape and Intersection project fund.	374660.02	4035200140.0	4023520014.0	Completed	A portion of this project will be completed by Public Works staff, and a portion will be completed by outside vendors.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
31	Project Management Services	Engineering and Construction	Public Works	Assistant Director, Transportation & Engineering		""	50000	200000	250000					0					0			""		0			""		0		""			0		""			0	0	0	0	0	0	Provided funding for professional management services related to Federal and State funded transportation projects.	This project was funded in the 2014 Capital Budget, but moving forward, project management will be associated with the specific projects to be managed.	200000.0	""	4026729414.0	Completed	This project will be associated with the specific projects to be managed.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
32	Second Avenue Bridge	Engineering and Construction	Public Works	Assistant Director, Transportation & Engineering		""			0					0		35000		665000	700000		123063	""	2338188	2461251		125000	""	2375000	2500000		""			0		""			0	0	283063	0	5378188	5661251	Design and related services for the construction of a bridge in the Duck Hollow area of Squirrel Hill.	This project is on the regional TIP.	81383.53	""	""	New	This project will result in a new bridge that will require minimal maintenance.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
33	South Negley Avenue Bridge	Engineering and Construction	Public Works	Assistant Director, Transportation & Engineering		""			0					0		50000		950000	1000000		75000	""	142500	217500			""		0		""	250000	4750000	5000000		""			0	0	125000	250000	5842500	6217500	Engineering services for the South Negley Avenue Bridge.	This project is on the regional TIP.	528149.1	""	4030093015.0	New	This project will result in a new bridge that will require minimal maintenance.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
34	Swinburne Bridge	Engineering and Construction	Public Works	Assistant Director, Transportation & Engineering		""			0					0		40000		760000	800000			""		0		32500	""	617500	650000		""					""	5000	95000	100000	0	72500	5000	1472500	1550000	Funds provided for the replacement of the bridge's superstructure.	This project is on the proposed regional TIP.	$ -	""	""	New	This project represents minimal operating expense other than the time of Engineering staff. A new bridge should realize some operational maintenance savings.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
35	West Ohio Street Bridge	Engineering and Construction	Public Works	Assistant Director, Transportation & Engineering	25000	""		475000	500000					0		223000		4237000	4460000			""		0			""		0		""			0		""			0	0	223000	0	4237000	4460000	Funds provided for the replacement of the bridge's superstructure.	This project is on the regional TIP.	299366.13	""	4023305914.0	Continuing	This project represents minimal operating expense other than the time of Engineering staff. A new bridge should realize some operational maintenance savings.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
36	Ammon Pool Filter	Facility Improvement	Public Works	Aquatics Foreman, Properties		""			0		250000			250000					0			""		0			""		0		""			0		""			0	0	250000	0	0	250000	This project provides funding for replacement of the pool's filter and enhancing access to the locker rooms.	Ammon pool is in need of filter replacement and would become unreliable without filter replacement.	$ -	""	4030094015.0	New	This project represents the operating expense of Public Works staff time. A new filter should realize operational maintenance savings.	Capital Project	Replacement of existing pool filter and filter room	Bedford Avenue	6 months	250000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
37	Beechview Community and Senior Center	Facility Improvement	Public Works	Project Manager, Transportation and Engineering		""	300000		300000		300000			300000		300000			300000			""		0			""		0		""			0		""			0	0	600000	0	0	600000	Funds will provide the full local match of a state grant to be used in the rehabilitation of a city-owned property. The rehabilitation will provide flexible community space as well as enhancing existing senior facilities.	The Beechview Community and Senior Center is a community asset for the South Pittsburgh area, and the funds are necessary to fully leverage the additional state support necessary to complete the project.	675463.52	""	4021450115.0	Continuing	The senior center design represents the time of city facilities staff. Once the center is operational, it is expected to be staffed at similar levels.	Capital Project	Design and Engineering	Broadway Avenue and Hampshire Avenue	1 year	300000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
38	Bob O'Connor Golf Course	Facility Improvement	Public Works	First Tee of Pittsburgh		""	160000		160000		160000			160000					0			""		0			""		0		""			0		""			0	0	160000	0	0	160000	Provides funding for capital improvements and maintenance of the Bob O'Connor Golf Course at Schenley Park.	Capital improvements for the golf course are managed by First Tee of Pittsburgh. The Bob O'Connor golf course offers access to low-cost recreation and golf instruction for all players, including seniors and persons with disabilities.	$ -	""	4023845215.0	Recurring	This project will have minimal impact on the operating budget. Public Works staff time will be needed to manage vendor contracts. In the future, this line item will be funded in the Operating Budget.	Capital Project	Capital Improvements	Schenley Drive	1 year	160000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
39	Construction Division Materials	Facility Improvement	Public Works	Various		""	50000		50000		50000			50000					0			""		0			""		0		""			0		""			0	0	50000	0	0	50000	This line item supports the purchase of construction materials to preserve and maintain various city assets.	Material is necessary for extending the useful life of city assets.	154643.73	""	4022009215.0	Recurring	Public Works staff time will be needed to procure materials.	Capital Project	Contingency	TBD	TBD	50000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
40	Facility Improvements	Facility Improvement	Public Works	Project Manager, Transportation and Engineering	200000	""	2000000	1000000	3200000	400000	2050000			2450000	1000000	3714376			4714376		3000000	""		3000000	1000000	2000000	""		3000000	800000	""	2735000		3535000	2000000	""	2500000		4500000	5200000	10764376	5235000	0	21199376	This plan involves substantial building improvements to be made to city-owned facilities.	Extending the useful life of city-owned buildings is critical. Without this project, the city would not be able to deliver core services.	1437762.38	4027003150.0	4026750015.0	Recurring	This project heavily impacts the operating budget due to Public Works staff time. In addition, staff time will be needed to manage vendor contracts.	Capital Project	City-County Building	Grant Street and Forbes Avenue	1 year	325000.0	Council Chamber Improvements	Grant Street and Forbes Avenue	1 year	25000	Medic 10	Shadeland Avenue and Dickson Street	6 months	175000	Police Zone 4 Security Upgrades	Northumberland Street and Asbury Place	6 months	200000	Southside Market House	Bedford Square and South 12th Street	6 months	300000	Municipal Courts Building Elevators	First Avenue	1 year	250000	Forestry Division Roof and Plumbing	Stanton Avenue	6 months	175000	Arlington Fire Station 22	Arlington Avenue and St. Patrick Street	6 months	250000	John P. Robin Civic Building Elevators and Life Safety Systems	Ross Street and Fourth Avenue	1 year	450000	Facilities Division Contingency	TBD	TBD	300000	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
41	Park Reconstruction	Facility Improvement	Public Works	Supervisor, Maintenance	250000	""	250000	825000	1325000	50000	355000		900000	1305000	220600	242710		850000	1313310	265600	196550	""	850000	1312150	249200	118680	""	850000	1217880	199200	""	286840	850000	1336040	215000	""	150000	850000	1215000	1199600	912940	436840	5150000	7699380	This line provides funding for the repair and rehabilitation of the city's parks, including regional parks.	Park amenities improve quality of life for residents and visitors.	796408.35	4045000150.0	4024500015.0	Recurring	This project heavily impacts the operating budget due to Public Works staff time. In addition, staff time will be needed to manage vendor contracts.	Capital Project	Homewood Park Sidewalk Repair	North Homewood and Frankstown Avenue	6 months	50000.0	Brighton Heights Fence Repair	Brighton Heights Road and Benton Avenue	6 months	70000	Four Mile Run Park Fence Repair	Frazier Street and Saline Street	6 months	20000	Mellon Park Sidewalk Repair	Fifth Avenue and Shady Avenue	6 months	90000	Wightman Park Sidewalk Repair	Wightman Street and Solway Street	6 months	70000	McKinley Park Fence Repair	Bausman Street and Bernd Street	6 months	55000	Resurfacing Various RAD Parks	TBD	1 year	200000	Park Maintenance Equipment in Various RAD Parks	TBD	1 year	200000	Playground Renovations in Various RAD Parks	TBD	1 year	450000	McCoy RAD Playground	Greenleaf Street and Shaler Street	6 months	20000	Olympia Park RAD Playground	Virginia Avenue and Olympia Road	6 months	30000	Contingency	TBD	TBD	50000	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
42	Play Area Improvements	Facility Improvement	Public Works	Supervisor, Maintenance	200000	""	200000	10000	410000	60000	320000			380000	125000	275000			400000	150000	250000	""		400000	200000	400000	""		600000	200000	""	300000		500000	150000	""	315000		465000	885000	1245000	615000	0	2745000	Provides funding to repair and rehabilitate a portion of the city's 129 playgrounds.	Playgrounds improve quality of life and are important amenities to nearby communities.	540594.3	4041002150.0	4024100215.0	Recurring	This project heavily impacts the operating budget due to Public Works staff time. In addition, staff time will be needed to manage vendor contracts.	Capital Project	Wabash Playground	Wabash Street and Plank Street	6 months	20000.0	Lawn and Ophelia Parklet Safety Surface	Lawn Street and Ophelia Street	6 months	40000	Frazier Park Equipment and Safety Surface	Frazier Street and Dawson Street	6 months	135000	Burgwin Park Equipment and Safety Surface	Mansion Street and Johnston Avenue	6 months	185000	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
43	Riverview Community and Senior Center	Facility Improvement	Public Works	Project Manager, Transportation and Engineering		""	250000		250000		800000	828567		1628567					0			""		0			""		0		""			0		""			0	0	800000	828567	0	1628567	Provides funding to construct a new community and senior center in Riverview Park. City funds will be used in conjunction with ARAD Capital dollars to leverage Commonwealth Support	Provides funding for a community and senior center in Riverview Park.	97080.44	""	502673814.0	Continuing	This project will have minimal impact on the operating budget. Public Works staff time will be needed to manage vendor contracts.	Capital Project	Riverview Park Improvements	Riverview Park	1 year	1600000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
44	Recreation and Senior Center Rehabilitation	Facility Improvement	Public Works	Project Manager, Transportation and Engineering	300000	""	150000		450000	201500	392500			594000	400000	300000			700000	500000	200000	""		700000	400000	250000	""		650000	300000	""	350000		650000	450000	""	150000		600000	2251500	1142500	500000	0	3894000	Provides funding for repairs necessary to prolong the life of senior and recreation centers.	Senior and Recreation centers are important city assets available to city residents, and capital repairs must be made to keep the centers functional.	1730539.2	4015010150.0	4021501015.0	Recurring	This project heavily impacts the operating budget due to Public Works staff time. In addition, staff time will be needed to manage vendor contracts.	Capital Project	Warrington Recreation and Senior Center Façade	East Warrington Avenue and Estella Avenue	6 months	150000.0	Morningside Recreation and Senior Center Upgrades	President Way and Antietam Street	6 months	27500	Hazelwood Recreation and Senior Center Upgrades	Second Avenue and Melancthon Street	6 months	55000	Magee Recreation and Senior Center Upgrades	Greenfield Avenue and McCaslin Street	6 months	100000	Philips Recreation and Senior Center HVAC	Parkfield Street and Park Boulevard	6 months	150000	Sheraden Recreation and Senior Center Upgrades	Sherwood Avenue and Ashlyn Street	6 months	87000	Contingency	TBD	TBD	20000	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
45	Splash Zones	Facility Improvement	Public Works	Project Manager, Transportation and Engineering	100000	""	100000		200000	200000	100000	400000		700000	200000	200000			400000	200000	200000	""		400000	200000	20083	""		220083		""	100000		100000	0	""	100000		100000	800000	520083	600000	0	1920083	This project will allow for the construction of splash zones in various neighborhoods.	Splash zones are incredibly popular and improve quality of life in the surrounding neighborhoods.	389917.43	4067355150.0	4026735515.0	Recurring	This project will have minimal impact on the operating budget. Public Works staff time will be needed to manage vendor contracts.	Capital Project	Arlington Spray Park Construction	Salisbury Street and Fernleaf Street	1 year	350000.0	Paulson Spray Park Construction	Paulson Avenue and Dean Street	1 year	350000	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
46	Sport Facility Improvements	Facility Improvement	Public Works	Engineering Technician, Transportation and Engineering	500000	""	150000	50000	700000	50000	200000			250000	100000	150000			250000	100000	150000	""		250000	100000	150000	""		250000	100000	""	150000		250000	100000	""	150000		250000	550000	650000	300000	0	1500000	Projects include the installation of poles and energy efficient lighting fixtures, the rehabilitation of various playing surfaces, fencing, dugouts, and concession stands.	Preserving sport facilities as city amenities remains a high priority to enhance the quality of life.	1040954.4	4067348150.0	4026734815.0	Recurring	A portion of this project will be completed by Public Works staff, and a portion will be completed by outside vendors.	Capital Project	Swisshelm Park Dek Hockey Resurface	Onondago Street and Nightingale Way	6 months	75000.0	Dinan Park Court Repair	Farmington Street and Lansing Way	6 months	75000	Contingency	TBD	6 months	100000	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
47	Swimming Pool Rehabilitation	Facility Improvement	Public Works	Aquatics Foreman, Properties	100000	""	100000		200000		250000			250000		275000			275000		275000	""		275000		275000	""		275000		""	275000		275000		""	270000		270000	0	1075000	545000	0	1620000	This line item provides for necessary repairs to swimming pools throughout the city.	The city's pools are popular public assets that require frequent maintainance and preservation to extend their useful lives.	660777.8	4042000150.0	4024200015.0	Recurring	This project heavily impacts the operating budget due to Public Works staff time. In addition, staff time will be needed to manage vendor contracts.	Capital Project	Ormsby Pool Liner	Ormsby Avenue and Otilia Street	1 month	75000.0	Philips Pool Liner	Parkfield Street and Park Boulevard	1 month	75000	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
48	Urban Redevelopment Authority Property Maintenance	Facility Improvement	Urban Redevelopment Authority	Director, Engineering and Construction		""	200000		200000			200000		200000			100000		100000		100000	""		100000		100000	""		100000		""	100000		100000		""	100000		100000	0	200000	500000	0	700000	This program allows for securing and maintaining URA owned property.	The URA holds property that is in the process of being redeveloped, which must be secured and maintained to preserve public safety.	$ -	""	8200002915.0	Recurring	There is no operational cost to the city; the project will be managed by the Urban Redevelopment Authority.	Intergovernmental Project	Contingency	TBD	TBD	100000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
49	City Clerk's Modernization	Facility Improvement	City Clerk's Office	Chief Clerk, City Clerk's Office		""	25000		25000					0					0			""		0			""		0		""			0		""			0	0	0	0	0	0	Provided funding for the modernization and rehabilitation of Council chambers.	This project was funded in the 2014 Capital Budget but will be funded in the Facility Improvements line item moving forward.	38519.0	""	12700014.0	Completed	Staff time will be necessary to manage any outside vendors.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
50	Elevator Repair and Maintenance	Facility Improvement	Finance	Contract Administrator, Finance		""	50000		50000					0					0			""		0			""		0		""			0		""			0	0	0	0	0	0	Provided funding for the restoration of the elevators on the City side of the City-County Building.	This project was funded in the 2014 Capital Budget but any similar work will now be funded in the Facility Improvements line item.	166265.77	""	722541014.0	Completed	This project will now be funded in the Facility Improvements line item and will have operational costs similar to facility improvements.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
51	Emergency Swimming Pool Repairs	Facility Improvement	Public Works	Aquatics Foreman, Properties	100000	""	100000		200000					0					0			""		0			""		0		""			0		""			0	0	0	0	0	0	Provided funding for unforeseen emergencies that required extensive swimming pool repairs.	This project was funded in the 2014 Capital Budget but will now be funded in the Swimming Pool Rehabilitation line item.	$ -	5067193140.0	5026719314.0	Completed	This project will now be funded in the Swimming Pool Rehabilitation line item.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
52	Lower Heth's Run Athletic Field Engineering	Facility Improvement	Public Works	Project Manager, Transportation and Engineering		""	200000		200000					0					0		200000	""	5000000	5200000		200000	""	5000000	5200000		""	200000	5000000	5200000		""			0	0	400000	200000	15000000	15600000	Provides funding for the rehabilitation of the Heth's Run Valley, including the daylighting of the stream, greening of the parking lot, the construction of a soccer facility, and construction of a scenic river overlook.	The development represents a better use for city property, with possible stormwater mitigation effects.	200000.0	""	4026750214.0	Continuing	This project will have minimal impact on the operating budget. Public Works staff time will be needed to manage vendor contracts.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
53	Refinish Gym Floors	Facility Improvement	Parks and Recreation	Facilities Maintenance Supervisor, Properties, Department of Public Works	100000	""			100000					0					0			""		0			""		0		""			0		""			0	0	0	0	0	0	Provided funding for the refinishing of the maple wood gymnasium floors throughout various recreation and senior centers.	This project was funded in the 2014 Capital Budget but will be included in the Recreation and Senior Center Rehabilitation line item.	124167.42	5067426140.0	""	Completed	This project will be included in the Recreation and Senior Center Rehabilitation line item.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
54	Demolition	Public Safety	Public Safety- Bureau of Building Inspection	Demolition Manager, Bureau of Building Inspection	200000	""	1800000		2000000			2000000		2000000			2000000		2000000	1000000	300000	""		1300000	1000000	300000	""		1300000		""	2000000		2000000		""	2000000		2000000	2000000	600000	8000000	0	10600000	This line item supports the demolition of dangerous property.	The demolition of dangerous property enhances public safety and enhances communities.	1734193.0	""	272100115.0	Recurring	This project will have minimal impact on the operating budget. Public Safety-Bureau of Building Inspection staff time is needed to manage vendor contracts.	Capital Project	Contingency	TBD	TBD	2000000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
55	Emergency Sheltering	Public Safety	Parks and Recreation	Assistant Director, Parks and Recreation		""			0	150000				150000		150000			150000			""		0			""		0		""			0		""			0	150000	150000	0	0	300000	This project funds the purchase of generator systems for City emergency shelter sites.	Emergency generators for the city's emergency shelter sites will provide security in the event of a power disruption.	$ -	5030096150.0	""	New	Generators will require yearly maintenance to make sure that they are functioning properly.	Capital Project	Installation of Emergency Generator	Homewood Senior Center	3 months	75000.0	Installation of Emergency Generator	South Side Senior Center	3 months	75000	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
56	Uniform Police Cameras	Public Safety	Public Safety-Bureau of Police	Assistant Chief, Bureau of Police		""			0		500000		150000	650000		500000		150000	650000			""		0			""		0		""			0		""			0	0	1000000	0	300000	1300000	This project funds new police technology to increase accountability and public safety.	Uniform police cameras increases the public's trust and protects officers while interacting with the public.	123080.28	""	""	New	This project will have minimal impact on the operating budget. Public Safety-Bureau of Police staff time is needed to manage vendor contracts.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
57	Public Works Radio Replacement	Public Safety	Public Works	Supervisor, Maintenance		""	500000		500000		500000			500000					0			""		0			""		0		""			0		""			0	0	500000	0	0	500000	Provides funding for the standardization of portable radios to be used by the City's Public Works Bureaus.	Radio equipment is a public safety concern and provides improved operational communication.	500000.0	""	2326749315.0	Continuing	This project will have minimal impact on the operating budget. Public Works staff time is needed to manage vendor contracts.	Capital Project	Acquisition of new radios	TBD	TBD	500000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
58	EMS Equipment	Public Safety	Public Safety-Bureau of Emergency Medical Services	Assistant Chief, Bureau of Emergency Medical Services		""	150000		150000					0					0			""		0			""		0		""			0		""			0	0	0	0	0	0	Provided funding for EMS equipment needed to enhance public safety and to comply with established standards.	This project was funded in the 2014 Capital Budget but moving forward, will be funded in the Operating Budget.	25404.78	""	2226200814.0	Completed	This project was funded in the 2014 Capital Budget but moving forward, will be funded in the Operating budget.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
59	Firefighting Equipment	Public Safety	Public Safety-Bureau of Fire	Assistant Chief, Bureau of Fire	100000	""	150000		250000					0					0			""		0			""		0		""			0		""			0	0	0	0	0	0	Provides funding for the purchase of fire equipment needed to enhance public safety and to comply with established standards.	This project was funded in the 2014 Capital Budget but moving forward, will be funded in the Operating Budget.	550881.69	2561200140.0	2526120014.0	Completed	This project was funded in the 2014 Capital Budget but moving forward, will be funded in the Operating budget.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
60	Police Equipment	Public Safety	Public Safety-Bureau of Police	Assistant Chief, Bureau of Police		""	250000		250000					0					0			""		0			""		0		""			0		""			0	0	0	0	0	0	Provided funding for the purchase of police equipment needed to enhance public safety and to comply with established standards.	This project was funded in the 2014 Capital Budget but moving forward, will be funded in the Operating Budget.	234538.28	""	2326745014.0	Completed	This project was funded in the 2014 Capital Budget but moving forward, will be funded in the Operating budget.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
61	Public Safety Radio Replacement	Public Safety	Public Safety-Bureau of Administration	Emergency Management Coordinator		""	650000		650000					0					0			""		0			""		0		""			0		""			0	0	0	0	0	0	Provided funding for the standardization of portable radios to be used by the City's Public Safety Bureaus.	This project was funded in the 2014 Capital Budget and has been completed.	671299.7	""	2326749314.0	Completed	This project is completed and will not have an impact on the operating budget.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
62	Training Center Design Study	Public Safety	Public Safety-Bureau of Administration	Project Manager, Transportation and Engineering, Department of Public Works		""	100000		100000					0					0			""		0			""		0		""			0		""			0	0	0	0	0	0	Provided funding for the design and planning of a Public Safety Training Center.	This project was funded in the 2014 Capital Budget and prior years' funding will be utilized to complete the project.	100000.0	""	2126749914.0	Continuing	This project will have minimal impact on the operating budget. Public Works staff time is needed to manage vendor contracts.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
63	Capital Vehicles and Equipment	Vehicles and Equipment	Equipment Leasing Authority	Fiscal and Fixed Assets Manager, Office of Management and Budget		""	5000000		5000000		5000000			5000000		5000000			5000000		5000000	""		5000000		5000000	""		5000000		""	5000000		5000000		""	5000000		5000000	0	20000000	10000000	0	30000000	This project supports the purchase of new vehicles and heavy equipment for the city of Pittsburgh to use for delivery of services.	Vehicles and equipment are necessary for the operations and safety of city residents and employees.	$ -	""	8425589915.0	Recurring	Office of Management and Budget staff time is needed to manage the fleet contract, which is partially paid for in the operating budget. In addition, various staff is needed to purchase and track vehicles and equipment.	Intergovernmental Project	Vehicle Acquisition	Various	1 year	5000000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
64	Fuel System Upgrade	Vehicles and Equipment	Office of Management and Budget	Fleet Contract Manager, Office of Management and Budget		""	50000		50000		130000			130000					0			""		0			""		0		""			0		""			0	0	130000	0	0	130000	This project is a continuation of the fuel-system upgrade to provide structural improvements to the three main fuel stations. Improvements in the facilities include driveway, approaches, and vehicle fueling pads, fuel island canopy rehabilitation, lighting, fencing and defined traffic flow.	Improving the fuel stations used by City vehicles increases efficiency and leads to faster service delivery.	56359.79	""	726735315.0	Continuing	The project is managed through the Office of Management and Budget. It should also lead to operational savings through increased efficiency in fuel delivery.	Capital Project	Improvements at 29th Street Garage	29th Street	1 year	45000.0	Improvements at Public Works Division 1 Garage	Public Works Division 1	1 year	45000	Improvements at Public Works Division 5 Garage	Public Works Division 5	1 year	40000	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
65	Hydraulic Rescue Tool	Vehicles and Equipment	Fire	Assistant Chief, Bureau of Fire		""			0		60000			60000					0			""		0			""		0		""			0		""			0	0	60000	0	0	60000	This funding provides for the replacement of an aging and inefficient hydraulic rescue tool system at the Wilkinsburg Fire Station. The city is required by contract to provide vehicle extrication services to Wilkinsburg. This project would also provide a hydraulic tool system at the Greenfield station to provide service when the Wilkinsburg engine is unavailable.	Hydraulic rescue tools represent safe and effective ways to assist emergency personnel in vehicle extraction of crash victims.	$ -	""	2530098015.0	New	This project is not expected to have an impact on the operating budget.	Capital Project	Hydraulic Rescue tool system	Wilkinsburg	NA	30000.0	Hydraulic Rescue tool system	Greenfield	NA	30000	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
66	Landscaping Heavy Equipment	Vehicles and Equipment	Public Works	Supervisor, Maintenance		""			0		100000			100000					0			""		0			""		0		""			0		""			0	0	100000	0	0	100000	This line item provides funding for public works equipment necessary for capital improvements.	Equipment is necessary for the city's operations and delivery of services.	$ -	""	4030097015.0	New	Various staff is needed to purchase and track equipment.	Capital Project	Equipment Acquisition	NA	1 year	100000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
67	Center for Innovation and Entrepreneurship	Neighborhood and Community Development	Urban Redevelopment Authority	Director, Innovation and Entrepreneurship	200000	""	180000		380000	200000		160000		360000			300000		300000	200000	200000	""		400000	200000	200000	""		400000	200000	""	200000		400000	200000	""	200000		400000	1000000	400000	860000	0	2260000	This line item funds various programs throughout the business district and entrepreneurship support efforts of the Urban Redevelopment Authority.	The Urban Redevelopment Authority provides necessary support to entrepreneurs and community business districts, enhancing vibrancy in communities.	200000.0	8226750140.0	8226750315.0	Recurring	There is no operational cost to the city; the project will be managed by the Urban Redevelopment Authority.	Intergovernmental Project	Storefront and Façade Program	TBD	TBD	80000.0	Streetface	TBD	TBD	10000	Mainstreets and Business Districts	TBD	TBD	180000	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
68	Choice Neighborhood	Neighborhood and Community Development	Urban Redevelopment Authority	Director, Housing Department		""		473000	473000	1818000		582000		2400000	1454400	727200		290880	2472480	1454400	545400	""	509040	2508840	1090800	436320	""	363600	1890720	1090800	""	218160		1308960		""			0	6908400	1708920	800160	1163520	10581000	City funding is being pledged in support of the Larimer/East Liberty Choice Neighborhood Transformation Plan. The plan calls for the development of approximately 334 mixed income units; comprehensive neighborhood improvements including green infrastructure, greening of vacant lots, parks and recreational opportunities, the promotion of commercial areas in support of job creating activities with a particular focus on green business and technology business.	City funds are required to leverage significant federal, private, and local support for the project.	$ -	8230101150.0	8230101015.0	Continuing	This project is expected to have limited impact on the operating budget of the City of Pittsburgh.	Intergovernmental Project	Phase I Development	Larimer Avenue	1 year	2400000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
69	Consultants for Plans and Studies	Neighborhood and Community Development	City Planning	Various		""			0		175000			175000		100000			100000		100000	""		100000		100000	""		100000		""	100000		100000		""	100000		100000	0	475000	200000	0	675000	Provides funding for planning and design studies for projects that promote the well-being of the city's neighborhoods, business districts, and green spaces.	Additional support is needed to supplement the work of the department of City Planning for plans and studies that will guide the development and growth of the city.	$ -	""	1130095015.0	New	City Planning staff will work closely with consultants, who will supplement the work of the department.	Capital Project	Neville Off-Road Bike Trail	Centre Avenue at Neville Street	1 year	30000.0	Wightman Park Master Plan	Wightman Street and Solway Street	6 months	30000	Zoning Code Reform	TBD	1 year	70000	Green Infrastructure Code Changes	TBD	TBD	45000	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
70	Council Community Facilities Fund	Neighborhood and Community Development	Bureau of Neighborhood Empowerment	Chief, Bureau of Neighborhood Empowerment		""			0			250000		250000					0			""		0			""		0		""			0		""			0					0	This line item funds a revolving loan fund intended to make minor capital improvements to childcare facilities in the City.	High quality child care significantly improves childrens early literacy, language, math, and social/emotional skills in preperation for pre-kindergarten. Child care programs and facilities are rated for quality by the Pennsylvania Keystone STARS (Standards, Training, Assistance, Resources, and Support) program, and the National Association for the Education of Young Children (NAEYC) Accreditation and Family Child Care Accreditation System. This line item will help improve the ratings of city childcare facilities	$ -	""	""	New	Staff Time and minimal resources for issuing Request for Proposals and contract management: The Bureau of Neighborhood Empowerment will issue a Request for Proposals to administer the goals of the Council Community Facilities Fund. The contracted entity will establish the qualifications to determine the eligibility of child care facilities, the terms of the fund and programming, and regulations for the allocation of funds.	Capital Project	""	Facilities Fund	TBD	TBD	250000.0	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
71	Cultural Heritage Plan	Neighborhood and Community Development	City Planning	Planner 2, City Planning	30000	""	10000	40000	80000		40000		40000	80000		40000		40000	80000			""		0			""		0		""			0		""			0	0	80000	0	80000	160000	Provides funds for matching grants and to develop and implement the Cultural Heritage Plan for the city.	The project will provide the city with a historic architectural inventory to guide planning and strategic development.	63098.64	1167383150.0	1126738315.0	Recurring	City Planning staff will work closely with consultants, who will supplement the work of the department.	Special Revenue Project	Historic Architectural Inventory	TBD	1 year	80000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
72	Economic Development and Housing	Neighborhood and Community Development	Urban Redevelopment Authority	Director, Housing Department	500000	""	445000	1800000	2745000	300000	120000	158000	1850000	2428000	0		500000	1850000	2350000	250000	300000	""	1850000	2400000	250000	400000	""	1850000	2500000	250000	""	400000	1850000	2500000	250000	""	400000	1850000	2500000	1300000	820000	1458000	11100000	14678000	The housing programs funded in this line include the HOME Rehabilitation Program, the Pittsburgh Party Wall Program, the Residential Façade Program, the Rental Housing Development and Improvement program, the Pittsburgh Housing Construction Fund, and the Community Development Investment Fund.	Enhancing the housing stock of the City of Pittsburgh is vital to sustaining our neighborhoods.	1510438.08	8267290150.0	8226732115.0	Recurring	There is no operational cost to the city; the project will be managed by the Urban Redevelopment Authority.	Intergovernmental Project	HOME Funding	TBD	TBD	1850000.0	Pittsburgh Home Rehabilitation Program	TBD	1 year	200000	Pittsburgh Party Wall Program	TBD	1 year	120000	Community Development Investment Fund	TBD	1 year	58000	Rental Housing Development and Improvement Program	TBD	1 year	50000	Pittsburgh Housing Construction Fund	TBD	1 year	100000	Residential Façade Program	TBD	1 year	50000	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
73	Major Developments	Neighborhood and Community Development	Urban Redevelopment Authority	Director, Housing Department	500000	""	500000		1000000			2941433		2941433			900000		900000		1000000	""		1000000		1000000	""		1000000		""	1000000		1000000		""	1000000		1000000	0	2000000	5841433	0	7841433	This project supports the work of the Urban Redevelopment Authority to conduct major economic development initiatives in various city neighborhoods.	Catalytic economic development projects have the potential to greatly benefit neighborhoods.	350000.0	8267321140.0	8226732115.0	Recurring	There is no operational cost to the city; the project will be managed by the Urban Redevelopment Authority.	Intergovernmental Project	Contingency	TBD	TBD	2941433.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
74	West End Alliance-Community Design Center	Neighborhood and Community Development	Urban Redevelopment Authority	Director, Urban Redevelopment Authority		""						80000		80000					0			""		0			""		0		""			0		""			0					0	Funds will be utilized for an Executive Director, housing plan, and various technical assistance as needed in the first year of operation.	The purpose of this project is to supply financial assistance for the start-up of the West End Alliance, an umbrella Community Development organization that will serve the West End communities.	$ -	""	""	New	There is no operational cost to the city; the project will be managed by the Urban Redevelopment Authority.	Intergovernmental Project	Contingency	TBD	TBD	80000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
75	ADA Compliance	Neighborhood and Community Development	City Planning	ADA Coordinator	25000	""			25000					0					0			""		0			""		0		""			0		""			0	0	0	0	0	0	Provides funding for the interpreting and captioning of City meetings and events.	This project was funded in the 2014 Capital Budget and prior years' funding will be utilized in 2015.	36436.06	1121151140.0	""	Recurring	Because this project is managed by the CDBG personnel, there is no operational cost to the city.	Special Revenue Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
76	Multi-Modal Transportation Planning and Education	Neighborhood and Community Development	City Planning	Various	40000	""	45000		85000					0					0			""		0			""		0		""			0		""			0	0	0	0	0	0	Provided funding for communication and outreach needs related to bicycle and pedestrian safety and infrastructure.	This project was funded in the 2014 Capital Budget but will be funded in the Bike Infrastructure line Item.	66065.24	1167497140.0	1126749714.0	Completed	This project will now be funded in the Bike Infrastructure line item.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
77	Responsible Hospitality	Neighborhood and Community Development	City Planning	Various		""	100000		100000					0					0			""		0			""		0		""			0		""			0	0	0	0	0	0	Provided funding for a comprehensive plan to manage nightlife impacts and economy.	This project was funded in the 2014 Capital Budget but will be funded in the Operating Budget in 2015.	$ -	""	1126748514.0	Completed	This project will now be funded in the operating budget. Public Safety-Bureau of Administration staff time will be needed to manage vendor contracts.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
78	CDBG Administration	Administration/Pass Through	City Planning	Assistant Director, Community Development Block Grant	50000	""			50000	70000				70000	50000				50000	50000		""		50000	50000		""		50000	50000	""			50000	50000	""			50000	320000	0	0	0	320000	This line item provides administrative funding for the operations of the CDBG program.	The CDBG administration line item is necessary to assure prompt and efficient dispersement of CDBG funding by utilizing professional and technical assistance to sub-recipients of CDBG funding.	105809.03	1156332150.0	""	Recurring	CDBG funding is used to support the salaries and administrative costs of the CDBG program. There is no operational cost to the city.	Special Revenue Project	Program Administration	N/A	1 year	70000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
79	CDBG Personnel	Administration/Pass Through	City Planning	Assistant Director, Community Development Block Grant	1000000	""			1000000	1000000				1000000	1100000				1100000	1100000		""		1100000	1100000		""		1100000	1100000	""			1100000	1100000	""			1100000	6500000	0	0	0	6500000	This line item provides for the salaries and benefits necessary for the operation of the CDBG program.	This line item is necessary to assure prompt and efficient dispersement of CDBG funding.	695846.95	1150000150.0	""	Recurring	CDBG funding is used to support the salaries and administrative costs of the CDBG program. There is no operational cost to the city.	Special Revenue Project	Program Administration	N/A	1 year	1000000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
80	Citizen Participation	Administration/Pass Through	City Planning	Assistant Director, Community Development Block Grant	200000	""			200000	200000				200000	200000				200000	200000		""		200000	180000		""		180000	180000	""			180000	180000	""			180000	1140000	0	0	0	1140000	This line item provides funding to the Design Center and the Community Technical Assistance Center for programs to encourage citizen participation in the Community Development Block Grant Program.	This item is necessary to engage residents and organizations and encourage participation in the CDBG program.	206680.0	1156900150.0	""	Recurring	CDBG funding is used to support the salaries and administrative costs of the CDBG program. There is no operational cost to the city.	Special Revenue Project	Design Center Outreach and Education	N/A	1 year	38000.0	Community Technical Assistance Center Outreach and Education	N/A	1 year	162000	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
81	Community Based Organizations	Administration/Pass Through	City Planning	Assistant Director, Community Development Block Grant	700000	""			700000	700000				700000	650000				650000	600000		""		600000	550000		""		550000	500000	""			500000	500000	""			500000	3500000	0	0	0	3500000	This project funds community development corporations and neighborhood groups doing work in CDBG-eligible areas.	As community advocates, CBOs are uniquely qualified to respond to pressing issues in neighborhoods.	765523.87	1121000150.0	""	Recurring	CDBG staff time is required to manage contracts with the respective organizations. There is no operational cost to the city.	Special Revenue Project	Distribution to community organizations	TBD	1 year	700000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
82	Council's Unspecified Local Option	Administration/Pass Through	City Planning	Assistant Director, Community Development Block Grant	940000	""			940000	895000				895000	850000				850000	825000		""		825000	800000		""		800000	800000	""			800000	750000	""			750000	4920000	0	0	0	4920000	This line item funds various qualifying non-profit organizations, selected by the members of City Council.	City Council's direct interation with the community makes it possible to target CDBG money to areas where it would be most effective.	1838922.71	Various	""	Recurring	CDBG staff time is required to manage contracts with the respective organizations. There is no operational cost to the city.	Special Revenue Project	Distribution to community organizations	Various	1 year	895000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
83	Emergency Solutions Grant	Administration/Pass Through	City Planning	Assistant Director, Community Development Block Grant		""		951000	951000				1083000	1083000				1083000	1083000			""	1083000	1083000			""	1083000	1083000		""		1083000	1083000		""		1083000	1083000	0	0	0	6498000	6498000	Provides for renovations, opperating expenses, and essential services such as childcare, drug and alchohol abuse education, job training, and counseling for homeless individuals and organizations that serve the homeless.	The U.S. Department of Housing and Urban Development provides funding for essential services and mandates the funding is used to target specific populations.	$ -	""	""	Recurring	CDBG staff time is required to manage contracts with the respective organizations. There is no operational cost to the city.	Special Revenue Project	Support for community organizations	N/A	1 year	1083000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
84	Fair Housing	Administration/Pass Through	Commission on Human Relations	Director, Commission on Human Relations	35000	""			35000	35000				35000	35000				35000	35000		""		35000	35000		""		35000	35000	""			35000	35000	""			35000	210000	0	0	0	210000	Provides program funding to encourage fair housing practices in the City.	This project supports policies that ensure all residents have equal access to the housing of their choice.	113557.51	538889150.0	""	Recurring	This project will have minimal impact on the operating budget. Commission on Human Relations staff time is needed to manage vendor contracts.	Special Revenue Project	Fair housing initiatives	N/A	1 year	35000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
85	Housing Opportunities for Persons with AIDS	Administration/Pass Through	City Planning	Assistant Director, Community Development Block Grant		""		690000	690000				723000	723000				723000	723000			""	723000	723000			""	723000	723000		""		723000	723000		""		723000	723000	0	0	0	4338000	4338000	This project provides funding for housing related services for those with HIV/AIDS in the City of Pittsburgh. Funding provides for tenant based rental assistance, emergency short-term mortgage assistance, utility assistance, and information referrals.	The U.S. Department of Housing and Urban Development provides funding for essential services and mandates the funding is used to target specific populations.	$ -	""	""	Recurring	CDBG staff time is required to manage contracts with the respective organizations. There is no operational cost to the city.	Special Revenue Project	Support for community organizations	N/A	1 year	723000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
86	Information Infrastructure Modernization	Administration/Pass Through	Innovation & Performance	Deputy Director, Innovation and Performance		""	300000		300000		100000			100000		100000			100000		149987	""		149987		200000	""		200000		""	200000		200000		""	200000		200000	0	549987	400000	0	949987	This line item provides funding for servers and server blades for the city's data center and the disaster recovery site.	Funding ensures that the city's information infrastructure remains responsive and secure.	524851.22	""	325100315.0	Recurring	Staff time from Innovation & Performance will be necessary to manage certain projects.	Capital Project	Replacement of server blades and servers	NA	1 year	100000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
87	Mayor's Unspecified Local Option	Administration/Pass Through	City Planning	Assistant Director, Community Development Block Grant	540000	""			540000	513000				513000	500000				500000	500000		""		500000	475000		""		475000	475000	""			475000	450000	""			450000	2913000	0	0	0	2913000	This line item funds various qualifying non-profit organizations, selected by the Office of the Mayor.	The Office of the Mayor's citywide purview will allow the administration to distribute CDBG money to areas where it would be most effective.	771871.24	Various	""	Recurring	CDBG staff time is required to manage contracts with the respective organizations. There is no operational cost to the city.	Special Revenue Project	Support through community organizations	Various	1 year	513000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
88	Neighborhood Employment Centers	Administration/Pass Through	Personnel and Civil Service Commission	Fiscal and Contracting Supervisor, Personnel and Civil Service	150000	""			150000	150000				150000	150000				150000	150000		""		150000	150000		""		150000	150000	""			150000		""			0	750000	0	0	0	750000	This program supports six neighborhood Employment Centers located in various parts of the City. These centers are charged with providing job opportunities for City residents by creating a network of neighborhood employment projects.	The City believes that supporting employment services improves the quality of life for all residents.	170394.9	909660150.0	""	Recurring	This line item uses CDBG funding to serve a population in need. There is no operating impact.	Special Revenue Project	Support for employment program at Brashear Associaties, Career & Workforce Center East, Carnegie Library of Pittsburgh, Eastside Neighborhood Employment Center, West End Works Neighborhood Employment Center & Tech Lab, and Northside Neighborhood Employment Center	N/A	1 year	150000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
89	Pittsburgh Employment Program	Administration/Pass Through	Personnel and Civil Service Commission	Fiscal and Contracting Supervisor, Personnel and Civil Service	150000	""			150000	150000				150000	150000				150000	150000		""		150000	150000		""		150000	150000	""			150000		""			0	750000	0	0	0	750000	This program supports job development and employment services with various community agencies in the form of staffing, skills training, outreach for business recruiting, and hiring of City residents.	The City believes that supporting employment services improves the quality of life for all residents.	265424.93	906322150.0	""	Recurring	This line item uses CDBG funding to serve a population in need. There is no operating impact.	Special Revenue Project	Support for employment program	N/A	1 year	150000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
90	Pittsburgh Summer Youth Employment Program	Administration/Pass Through	Personnel and Civil Service Commission	Youth Program Supervisor, Personnel and Civil Service	650000	""			650000	700000				700000	700000				700000	700000		""		700000	700000		""		700000	700000	""			700000	700000	""			700000	4200000	0	0	0	4200000	The PSYEP provides City youth, between 14 to 21 years of age, a six-week summer employment experience. Funds are used to pay the wages for the youth and supervisors.	Youth employment is an important tool in combatting poverty and improving the job prospects of young City residents.	99394.95	906323150.0	""	Recurring	The line item includes costs for the implementation of the program, and minimal operating budget support is required.	Special Revenue Project	Support for employment program	N/A	1 year	700000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
91	Senior Community Program	Administration/Pass Through	Parks and Recreation	Assistant Director, Parks and Recreation	700000	""			700000	700000				700000	700000				700000	700000		""		700000	700000		""		700000	700000	""			700000	700000	""			700000	4200000	0	0	0	4200000	Provides funding to cover salaries for senior programming. Funds cover approximately six months of salaries.	The senior program provides activities to seniors in community centers across the city.	557707.0	5015003150.0	""	Recurring	This line item uses CDBG funding to serve a population in need. The expenses are operational in nature, and they have been deemed an appropriate use of CDBG funding. Parks and Recreation staff time is needed to manage the program.	Special Revenue Project	Programming	TBD	1 year	700000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
92	Urban League-Housing Counseling	Administration/Pass Through	City Planning	Assistant Director, Community Development Block Grant	100000	""			100000	100000				100000	100000				100000	100000		""		100000	100000		""		100000	100000	""			100000	100000	""			100000	600000	0	0	0	600000	This program provides comprehensive housing counseling services to low and moderate income city residents.	Housing counseling helps residents begin the path to homeownership and stay in their homes when they face challenges.	100000.0	1116303150.0	""	Recurring	CDBG staff time is required to manage contracts with the respective organizations. There is no operational cost to the city.	Special Revenue Project	Distribution to community organizations	TBD	1 year	100000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
93	Urban Redevelopment Authority Personnel	Administration/Pass Through	Urban Redevelopment Authority	Director, Finance, URA	2000000	""			2000000	2000000				2000000	2000000				2000000	2000000		""		2000000	2000000		""		2000000	2000000	""			2000000	2000000	""			2000000	12000000	0	0	0	12000000	This line item funds the administration of URA Economic Development, Housing, Major projects, and Innovation Center.	The Urban Redevelopment Authority provides critical support to economic development projects city-wide.	231600.0	8200018150.0	""	Recurring	Because this project is managed by the Urban Redevelopment Authority, there is no operational cost to the City.	Special Revenue Project	Program Administration	N/A	1 year	2000000.0	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
94	Comprehensive Plan (PLANPGH)	Administration/Pass Through	City Planning	Various		""	145000	100000	245000					0					0			""		0			""		0		""			0		""			0	0	0	0	0	0	Provided funding to develop a comprehensive plan for the City of Pittsburgh to make better decisions on land and financial resources.	This project was funded in the 2014 Capital Budget and will utilize prior years' funding in 2015.	510000.0	""	1125613214.0	Completed	This project will have minimal impact on the operating budget. City Planning staff time is needed to manage vendor contracts.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
95	Minority and Women Educational Labor Agency	Administration/Pass Through	Equal Opportunity Review Commission	Manager, Equal Opportunity Review Commission	30000	""			30000					0					0			""		0			""		0		""			0		""			0	0	0	0	0	0	Provides funding for programs to increase opportunities to minorities and women in the construction industry.	This project was funded in the 2014 Capital Budget. Future project collaboration will be through the Mayor's Bureau of Neighborhood Empowerment.	30000.0	867350140.0	""	Completed	CDBG staff time is required to manage contracts with the respective organizations. There is no operational cost to the city.	Special Revenue Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
96	Planning and Management	Administration/Pass Through	City Planning	Various	75000	""	40000		115000					0					0			""		0			""		0		""			0		""			0	0	0	0	0	0	Provided funding for design, analysis, and planning activities for development and neighborhood improvement projects.	This project was funded in the 2014 Capital Budget, but the CDBG portion will be funded in the CDBG Administration line item, and the City portion will be funded in the Consultants for Plans and Studies line item in 2015.	260115.19	1156132140.0	1125613214.0	Completed	This project will now be funded in the CDBG Administration and the Consultants for Plans and Studies line item.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
97	Public Safety Systems	Administration/Pass Through	Innovation & Performance	Deputy Director, Innovation and Performance		""	200000		200000					0					0			""		0			""		0		""			0		""			0	0	0	0	0	0	Provided funding for programming, professional services, and related hardware and software for continued public safety enhancements.	This project was funded in the 2014 Capital Budget but will be funded in the 2015 Operating budget.	200000.0	""	326155514.0	Completed	This project will have minimal impact on the operating budget. Innovation & Performance staff time is needed to manage vendor contracts.	Capital Project	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
98	Totals	""	""	""	13000000	0.0	25000000	14431600	52431600	13000000	25000000	10000000	28778543	76778543	13000000	25000000	5000000	18925750	61925750	13000000	25000000	0.0	16095728	54095728	13000000	25000000	0.0	18066766	56066766	13000000	0.0	25000000	22181000	60181000	13000000	0.0	25000000	5401000	43401000	78000000	100000000	64670000	105448787	348118787	""	""	""	""	""	""	""	""	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
99	""	""	""	""		""																""					""				""					""									""	""	""	""	""	""	""	""	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	
100	""	""	""	""		""																""					""				""					""									""	""	35040908.9	""	""	""	""	""	""	""	""	""	""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""		""	""	""	